The simple answer is no, providing space is not a problem, but there are other considerations;
- To install a solar PV array with an output over 3.68kW consent is required from the District Network Operator (DNO) who manage the local electricity infrastructure.
- You should consider how much of the self-generated electricity you will use and how much is likely to be exported. Unless you will use most of the electricity, the financial return may not be attractive. Fervo will discuss this with you and prepare a Performance Estimate outlining the likely financial benefits your proposed solar PV array will provide.